100% Original Hand Wash Station - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe
100% Original Hand Wash Station - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe Detail:

The third generation added wheels:



1.With rotomolding technology, the hand wash is very strong and durable.
2.Clean water tank and waste water tank can be connected or divided.
3.Small size and light weight,easy to carry.
2.Details

3.Project
4.Packing

5.Application
Application :Hospital, Clinic, Outdoor Park, Exhibition, Public Places, Family Use
Advantage : Independent existence and extremely deft, have 2 independent wash one’s hands stage, apply to any high flow rate crowd in high-grade place.

Product detail pictures:
Related Product Guide:
It is a good way to enhance our products and solutions and repair. Our mission will be to build creative solutions to consumers with a great experience for 100% Original Hand Wash Station - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe , The product will supply to all over the world, such as: Austria, Cairo, Guinea, Based on products with high quality, competitive price, and our full range service, we have accumulated professional strength and experience, and we have built up a very good reputation in the field. Along with the continuous development, we commit ourselves not only to the Chinese domestic business but also the international market. May you moved by our high quality products and passionate service. Let's open a new chapter of mutual benefit and double win.
How to Buy a VHCON Prefab House?
Step 1: Initial Enquiry or Display Hall Visit
Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.
You can also book a private tour at our Display Hall to view our houses in person.
Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.
Step 2: Site Suitability & Pre-Approval Check
Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.
You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.
This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.
Step 3: Contract Signing & Initial Deposit
Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.
This contract will outline:
- The scope of works and what’s included in your Expander Home package
- Customisations (if any) and your selected finishes
- Estimated timeframes for manufacturing, delivery, and installation
- Payment terms, including deposit and progress payments
To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.
Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.
Step 4: Factory Construction
Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.
The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.
Step 5: Shipping, Transport & Delivery
Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.
Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.
After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.
The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!









