2 Storey Prefabricated Living Home Container House for Office

Short Description:


Product Detail

PROCESS

1.Assembly Container house

The prefab house is a new type of energy-saving and environmentally-friendly house. It is mainly a steel-wood composite structure, which can be flexibly combined and installed. You can choose the construction site and construction area according to your needs. It is suitable for being located on mountain slopes, hills, grasslands, and deserts. , Riverside. It is the flexible and changeable features of the prefabricated house that have been widely used by users in family tourism, villas and villas and other leisure and entertainment places in recent years; it is because of the simple disassembly and assembly of the prefabricated house that it is easy to transport Various industries are used in guard booths, duty rooms, dormitories, distribution boxes, workshop sheds, offices, etc.

House-for-Office
wenzi1

1.Perfect for modular/prefab site offices, cabins, warehouse, villa, toliet, shop, hotel, camp, office.

2.Long lifespan,attractive appearance,good earthquake proof,green and energy saving, fast and easy to install etc……

Item

Specificaion

remark

steel frame

2400x6000x2650

3000x6000x2750

 bolts connection

roof panel

0.376ppgi/0.476ppgi

 

glass wool insulation

40kg/m3

 

celing panel

0.426ppgi

customzied

downspout

D=40mm,L=2610mm

 

wall panel

0.376+50mm EPS +0.376

 

aluminium windows

1120mmx1100mm

customzied

steel door

840mmX2035mm

customzied

pvc angle line

for inside decoration

customzied

pvc carpet

1.5mm thickness

customzied

MGO board

18mm thickness

 

Service

Customize your services to your needs

A variety of color options are available depending on your preferences

According to your needs to provide toilet, shower facilities

Provide urgent service according to your requirement

1.Assembly Container house (7)
1.Assembly Container house (6)

2.Details

House-for-Office4

Reliable structure: The light steel flexible structure system is safe and reliable and meets the requirements of building structure design specifications.

Convenient dis-assembly and assembly: The house can be disassembled and assembled many times and reused. Only simple tools are required for the installation process. The average person can install 20-30 square meters per day, and 6 people can complete a 3K×10K standard prefabricated house in just 2 days.

Beautiful decoration: The overall house is beautiful and generous, with bright color, soft texture, flat surface and good decoration effect.

3.Advantage

1.Safe and durable: anti-earthquake 8 grades, wind resistant 11 grades.

2.100% waterproof.

3.Long service life for more than 20 years. Economical and sustainable.

4.100% bolt connection, easy installation.

5. Easy transported.It can movable at anytime.

6.Many modular units can be stacked and linked together to create more space.

7.A team of 4 experienced workers can install one house per day.

8.Loading capacity 16units/40HQ, saving shipping cost.

9.Efficient, low cost designs that can be customized for end user requirements.

4.Overseas Project

maomaoloy (4) maomaoloy (6) maomaoloy (8) maomaoloy (10)

5.Company

VANHE INTRODUCTION

VANHE House is a service provider that focuses on providing users with mobile space systematic overall solutions. 

With the increasing influence of the industry, continuous expansion of production scale and gradual improvement of the business system, the three core series of smart ecological public toilets, modular assembly rooms, and mobile commercial sales booths have been established as core products for the market, which have won municipal and public institutions and scenic spots. 

We're manufacturer who specialized in finished house, we can offer a series of finished house more than 500 types of products for your option, including sentry box, guard house, container house, container villa, steel structure, prefab toilet etc to meet our customers multiple demands.

6.FAQ

Q: Are you a factory or trading company?

A: We are a factory. Welcome to our factory.

Q: What's your supply capacity?

A:Annual Production: container house 72000 sets, prefab house 564000 square meters; portable toilet 24000 sets; steel structure 360000 square meters.

Q: What should we do if we have no professional worker to install? 

A: Our container design is perfect, you can do that DIY as per our drawing easily, We will provide the detailed assembled construction and install video; We can send our engineer to give the guide service on you site if necessary.

Q: How long is your delivery time?

A: Generally it is within 2-30 days, specific time depends on the order.

Q: How do you guarantee the quality of the products?

A: Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures and must be 100% quality before delivery.

Q: How can I get the quotation of the project?

A: If you have drawing, we can offer you our quotation according to your drawing. If you have no design,Our engineer will design some drawings for you to confirm and then offer you a quotation.


  • Previous:
  • Next:

  • How to Buy a VHCON Prefab House?

    Step 1: Initial Enquiry or Display Hall Visit

    Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.

    You can also book a private tour at our Display Hall to view our houses in person.

    Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.

    Step 2: Site Suitability & Pre-Approval Check

    Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.

    You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.

    This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.

    Step 3: Contract Signing & Initial Deposit

    Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.

    This contract will outline:

    • The scope of works and what’s included in your Expander Home package
    • Customisations (if any) and your selected finishes
    • Estimated timeframes for manufacturing, delivery, and installation
    • Payment terms, including deposit and progress payments

    To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.

    Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.

    Step 4: Factory Construction

    Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.

    The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.

    Step 5: Shipping, Transport & Delivery

    Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.

    Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.

    After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.

  • Write your message here and send it to us