2 Storey Prefabricated Living Home Container House for Office
1.Assembly Container house
The prefab house is a new type of energy-saving and environmentally-friendly house. It is mainly a steel-wood composite structure, which can be flexibly combined and installed. You can choose the construction site and construction area according to your needs. It is suitable for being located on mountain slopes, hills, grasslands, and deserts. , Riverside. It is the flexible and changeable features of the prefabricated house that have been widely used by users in family tourism, villas and villas and other leisure and entertainment places in recent years; it is because of the simple disassembly and assembly of the prefabricated house that it is easy to transport Various industries are used in guard booths, duty rooms, dormitories, distribution boxes, workshop sheds, offices, etc.
1.Perfect for modular/prefab site offices, cabins, warehouse, villa, toliet, shop, hotel, camp, office.
2.Long lifespan,attractive appearance,good earthquake proof,green and energy saving, fast and easy to install etc……
|
Item |
Specificaion |
remark |
|
steel frame |
2400x6000x2650 3000x6000x2750 |
bolts connection |
|
roof panel |
0.376ppgi/0.476ppgi |
|
|
glass wool insulation |
40kg/m3 |
|
|
celing panel |
0.426ppgi |
customzied |
|
downspout |
D=40mm,L=2610mm |
|
|
wall panel |
0.376+50mm EPS +0.376 |
|
|
aluminium windows |
1120mmx1100mm |
customzied |
|
steel door |
840mmX2035mm |
customzied |
|
pvc angle line |
for inside decoration |
customzied |
|
pvc carpet |
1.5mm thickness |
customzied |
|
MGO board |
18mm thickness |
Service
Customize your services to your needs
A variety of color options are available depending on your preferences
According to your needs to provide toilet, shower facilities
Provide urgent service according to your requirement
2.Details
Reliable structure: The light steel flexible structure system is safe and reliable and meets the requirements of building structure design specifications.
Convenient dis-assembly and assembly: The house can be disassembled and assembled many times and reused. Only simple tools are required for the installation process. The average person can install 20-30 square meters per day, and 6 people can complete a 3K×10K standard prefabricated house in just 2 days.
Beautiful decoration: The overall house is beautiful and generous, with bright color, soft texture, flat surface and good decoration effect.
3.Advantage
1.Safe and durable: anti-earthquake 8 grades, wind resistant 11 grades.
2.100% waterproof.
3.Long service life for more than 20 years. Economical and sustainable.
4.100% bolt connection, easy installation.
5. Easy transported.It can movable at anytime.
6.Many modular units can be stacked and linked together to create more space.
7.A team of 4 experienced workers can install one house per day.
8.Loading capacity 16units/40HQ, saving shipping cost.
9.Efficient, low cost designs that can be customized for end user requirements.
4.Overseas Project
5.Company
VANHE INTRODUCTION
VANHE House is a service provider that focuses on providing users with mobile space systematic overall solutions.
With the increasing influence of the industry, continuous expansion of production scale and gradual improvement of the business system, the three core series of smart ecological public toilets, modular assembly rooms, and mobile commercial sales booths have been established as core products for the market, which have won municipal and public institutions and scenic spots.
We're manufacturer who specialized in finished house, we can offer a series of finished house more than 500 types of products for your option, including sentry box, guard house, container house, container villa, steel structure, prefab toilet etc to meet our customers multiple demands.
6.FAQ
Q: Are you a factory or trading company?
A: We are a factory. Welcome to our factory.
Q: What's your supply capacity?
A:Annual Production: container house 72000 sets, prefab house 564000 square meters; portable toilet 24000 sets; steel structure 360000 square meters.
Q: What should we do if we have no professional worker to install?
A: Our container design is perfect, you can do that DIY as per our drawing easily, We will provide the detailed assembled construction and install video; We can send our engineer to give the guide service on you site if necessary.
Q: How long is your delivery time?
A: Generally it is within 2-30 days, specific time depends on the order.
Q: How do you guarantee the quality of the products?
A: Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures and must be 100% quality before delivery.
Q: How can I get the quotation of the project?
A: If you have drawing, we can offer you our quotation according to your drawing. If you have no design,Our engineer will design some drawings for you to confirm and then offer you a quotation.
How to Buy a VHCON Prefab House?
Step 1: Initial Enquiry or Display Hall Visit
Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.
You can also book a private tour at our Display Hall to view our houses in person.
Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.
Step 2: Site Suitability & Pre-Approval Check
Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.
You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.
This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.
Step 3: Contract Signing & Initial Deposit
Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.
This contract will outline:
- The scope of works and what’s included in your Expander Home package
- Customisations (if any) and your selected finishes
- Estimated timeframes for manufacturing, delivery, and installation
- Payment terms, including deposit and progress payments
To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.
Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.
Step 4: Factory Construction
Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.
The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.
Step 5: Shipping, Transport & Delivery
Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.
Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.
After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.


















