Premium 20ft 1 Bed Expandable Home with Balcony
Framing:
The structure is galvanized steel with 75mm EPS sandwich panels, making the house very well insulated and keeping it cool in summer and warm in winter, and is compliant with an Australian engineers design certificate and form 15 for council.
The house is very homely, bright, has plenty of windows for natural light and will deliver a fantastic return on investment, however you use it.
.Advantage
Advantage of the container house:
First of all, the cost of container is 30% lower than that of traditional building, which is more suitable for individual small-scale operation;
Secondly, the construction period is short, more than 85% faster than the traditional structure, and the construction period can be as fast as 10 days;
At the same time, the container building can be moved;
In addition, container house is built without construction waste and noise pollution, which is green and environmental protection
3.Project
100% Water Proof
√Wind Resistant
√Earth Resistant
Rust And Corrosion Resistant
√Popular In Europe
√Easy Step
√Durable And Comfortable
* Each house has 37.44 SQM large construction area. You can make 1 bedroom and 2 bedrooms design
* 4 people, 10 mins finished set up
* We have high-density insulation, it can prevent heat and keep warm. We have EN 1090-1 Standard. CE high-quality assurance and also already get through ISO9001 certification.
Process
Step 1: Initial Enquiry or Display Hall Visit
Start by contacting the VHCON sales team for a no-obligation chat about your project. We'll walk you through the options, answer any questions, and explain what's involved with owning a Expandable Home.
You can also book a private tour at our Display Hall to view our houses in person.
Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.
Step 2: Site Suitability & Pre-Approval Check
Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.
You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.
This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.
Step 3: Contract Signing & Initial Deposit
Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.
This contract will outline:
- The scope of works and what's included in your Expander Home package
- Customisations (if any) and your selected finishes
- Estimated timeframes for manufacturing, delivery, and installation
- Payment terms, including deposit and progress payments
To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.
Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.
Step 4: Factory Construction
Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.
The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.
Step 5: Shipping, Transport & Delivery
Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.
Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.
After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.















