Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe

Short Description:


Product Detail

Related Video

Feedback (2)

With our excellent management, strong technical capability and strict quality control system, we continue to provide our clients with reliable quality, reasonable prices and excellent services. We aim at becoming one of your most reliable partners and earning your satisfaction for Chicken Coop House, Prefab Tiny Home, Steel Building House, We are sincerely looking forward to cooperate with customers all over the world. We believe we can satisfy with you. We also warmly welcome customers to visit our factory and purchase our products.
Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe Detail:

1.Building System

Higher reliability of steel work. Long using time up to 50 years.

●Steel structure is impact, stable and good anti-seismic of the weight is light.        

●Steel structure used for a higher degree of industrialization.

●Steel structures can be assembled quickly and accurately, time saving and labor saving.

●Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 80meters.       

●Likely to cause sealing structure.

●Beautiful appearance: can use different colors and structure.  

●Environment friendly: Most of the excess material can be 100% recycled.

●Lower cost and easy maintenance.

●Flexible:   can be dismantled and enlarged.   

●Manufacture under complete quality control system—ISO9001/ISO14000.

1
.Building  (1)
2

2.Overseas Project

(Over than 2000+projects)

.Building  (2)

3.Steel Structure Customer Feedback

.Building  (3)

4.Quote Information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.Project site location:

2.Overall dimension (length*width*eave height in meters):

3.Mezzanine or not? How many kgs of load per square meter on mezzanine?

4.Single-layer steel sheet wall or sandwich panel wall:

5.Snow load if applicable:

6.Wind speed/load:

7.Interior column allowed or not:

8.Overhead crane needed or not,capacity?:

9.Any other particular requirements?:

Building Purpose:we will recommend the best design for the purpose of the building

A.Warehouse/Storage

B.Factory

C.Agriculture Barn

D.Retail Store

E.RepairlMechanic Shop

F.Office Space

G. Medical Warehouse

H.Animal Farm (please confirm what kind of animal)

 

.Building  (4)

5.Company

 .Building  (5)

6.Packaging&Delivery

 

.Building  (6)


Product detail pictures:

Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures


Related Product Guide:

owing to excellent assistance, a variety of top of the range items, aggressive costs and efficient delivery, we take pleasure in a very good standing amongst our shoppers. We've been an energetic corporation with wide market for Best Price on Pre Engineered Metal Building - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe , The product will supply to all over the world, such as: Poland, Denver, Provence, Facing fierce global market competition, we have launched the brand building strategy and updated the spirit of "human-oriented and faithful service", with an aim to gain global recognition and sustainable development.
  • It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Wendy from Argentina - 2017.12.31 14:53
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Nana from Armenia - 2018.05.13 17:00
    Write your message here and send it to us