Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe

Short Description:


Product Detail

PROCESS

Related Video

Feedback (2)

To create much more benefit for consumers is our company philosophy; customer growing is our working chase for Modular Small Homes, Chicken Houses For Sale, portable public toilet, Our aim is "blazing new ground, Passing Value", in the future, we sincerely invite you to grow up with us and make a bright future together!
Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe Detail:

1.Hand Wash Station表格

图片1

The third generation added wheels:

图片2
图片3
4

1.With rotomolding technology, the hand wash is very strong and durable.

2.Clean water tank and waste water tank can be connected or divided.

3.Small size and light weight,easy to carry.

2.Details

图片4

3.Project

4.Packing

图片7

5.Application

Application :Hospital, Clinic, Outdoor Park, Exhibition, Public Places, Family Use
Advantage : Independent existence and extremely deft, have 2 independent wash one’s hands stage, apply to any high flow rate crowd in high-grade place.

图片8


Product detail pictures:

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures

Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe detail pictures


Related Product Guide:

In an effort to provide you advantage and enlarge our business enterprise, we even have inspectors in QC Staff and assure you our greatest provider and item for Bottom price Outdoor Sink - Outdoor Washing Hand Plastic Sink and Movable Hand Wash Stations – Vanhe , The product will supply to all over the world, such as: Croatia, Sheffield, Lesotho, High output volume, top quality, timely delivery and your satisfaction are guaranteed. We welcome all inquiries and comments. If you are interested in any of our products or have an OEM order to fulfill, please feel free to contact us now. Working with us will save you money and time.

How to Buy a VHCON Prefab House?

Step 1: Initial Enquiry or Display Hall Visit

Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.

You can also book a private tour at our Display Hall to view our houses in person.

Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.

Step 2: Site Suitability & Pre-Approval Check

Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.

You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.

This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.

Step 3: Contract Signing & Initial Deposit

Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.

This contract will outline:

  • The scope of works and what’s included in your Expander Home package
  • Customisations (if any) and your selected finishes
  • Estimated timeframes for manufacturing, delivery, and installation
  • Payment terms, including deposit and progress payments

To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.

Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.

Step 4: Factory Construction

Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.

The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.

Step 5: Shipping, Transport & Delivery

Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.

Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.

After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.

  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Marcie Green from Pakistan - 2017.03.07 13:42
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Patricia from UAE - 2017.11.20 15:58
    Write your message here and send it to us