Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe

Short Description:


Product Detail

Related Video

Feedback (2)

We have been commitment to supply the competitive price ,excellent products and solutions high-quality, at the same time as fast delivery for poultry house, container house supplier, Container House Manufacturer, We always stick to the principle of "Integrity, Efficiency, Innovation and Win-Win business". Welcome to visit our website and do not hesitate to communicate with us. Are you ready? ? ? Let us go!!!
Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe Detail:

1.Building System

Higher reliability of steel work. Long using time up to 50 years.

●Steel structure is impact, stable and good anti-seismic of the weight is light.        

●Steel structure used for a higher degree of industrialization.

●Steel structures can be assembled quickly and accurately, time saving and labor saving.

●Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 80meters.       

●Likely to cause sealing structure.

●Beautiful appearance: can use different colors and structure.  

●Environment friendly: Most of the excess material can be 100% recycled.

●Lower cost and easy maintenance.

●Flexible:   can be dismantled and enlarged.   

●Manufacture under complete quality control system—ISO9001/ISO14000.

1
.Building  (1)
2

2.Overseas Project

(Over than 2000+projects)

.Building  (2)

3.Steel Structure Customer Feedback

.Building  (3)

4.Quote Information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.Project site location:

2.Overall dimension (length*width*eave height in meters):

3.Mezzanine or not? How many kgs of load per square meter on mezzanine?

4.Single-layer steel sheet wall or sandwich panel wall:

5.Snow load if applicable:

6.Wind speed/load:

7.Interior column allowed or not:

8.Overhead crane needed or not,capacity?:

9.Any other particular requirements?:

Building Purpose:we will recommend the best design for the purpose of the building

A.Warehouse/Storage

B.Factory

C.Agriculture Barn

D.Retail Store

E.RepairlMechanic Shop

F.Office Space

G. Medical Warehouse

H.Animal Farm (please confirm what kind of animal)

 

.Building  (4)

5.Company

 .Building  (5)

6.Packaging&Delivery

 

.Building  (6)


Product detail pictures:

Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures


Related Product Guide:

Our primary purpose is to give our shoppers a serious and responsible company relationship, giving personalized attention to all of them for Fast delivery Storage Buildings - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe , The product will supply to all over the world, such as: London, Iceland, Somalia, We take measure at any price to attain essentially the most up-to-date gear and procedures. The packing of nominated brand is our a further distinguishing feature. The solutions to assure years of trouble-free service has attracted a great deal customers. The goods are obtainable in improved designs and richer variety, they're produced scientifically of purely raw supplies. It accessible in a variety of designs and specifications for the selection. The newest forms are much far better than the previous one and they're extremely popular with several clients.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Salome from Ghana - 2018.12.05 13:53
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Danny from Victoria - 2017.03.28 12:22
    Write your message here and send it to us