OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe

Short Description:


Product Detail

PROCESS

Related Video

Feedback (2)

Our company sticks into the basic principle of "Quality is definitely the life of the business, and status may be the soul of it" for Small Chicken Coop, Folding Container Home, Buildings Company, Special emphasis around the packaging of merchandise to avoid any damage during transportation,Detailed interest into the useful feedback and strategies of our esteemed shoppers.
OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe Detail:


Product detail pictures:

OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe detail pictures

OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe detail pictures

OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe detail pictures


Related Product Guide:

With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for OEM Supply Container House Price - VHCON X3 High Quality Isolation House Medical Quick Assemble Modular Flat Pack Folding Container House Price – Vanhe , The product will supply to all over the world, such as: Tunisia, Belgium, Holland, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, now we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.

How to Buy a VHCON Prefab House?

Step 1: Initial Enquiry or Display Hall Visit

Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.

You can also book a private tour at our Display Hall to view our houses in person.

Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.

Step 2: Site Suitability & Pre-Approval Check

Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.

You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.

This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.

Step 3: Contract Signing & Initial Deposit

Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.

This contract will outline:

  • The scope of works and what’s included in your Expander Home package
  • Customisations (if any) and your selected finishes
  • Estimated timeframes for manufacturing, delivery, and installation
  • Payment terms, including deposit and progress payments

To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.

Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.

Step 4: Factory Construction

Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.

The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.

Step 5: Shipping, Transport & Delivery

Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.

Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.

After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.

  • This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Bertha from Paris - 2018.11.22 12:28
    High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Elsie from Rio de Janeiro - 2017.04.08 14:55
    Write your message here and send it to us