Professional Design House Container Luxurious - New Style Prefab Folding Furnished Container House Tiny House – Vanhe
Professional Design House Container Luxurious - New Style Prefab Folding Furnished Container House Tiny House – Vanhe Detail:
1.Folding Container House

EXCLUSIVE PATENT
The folding container room is sound insulation,fireproof, waterproof, sand-proof, windproof and shockproof and other characteristics.It could be live in temporary or permanently.Can be used for Office,storage room study room and so on.The galvanized steel frame is durable and anti-corrosive,the wall and roof are color steel sandwich panels,it is good at insulation ,it can be also used at desert,grass land,snow-berg,seaside,it should be all-weather.It is easy to transport, the steel components are assembled together ,it just need one crane and two workers finish installing the container in a few minutes.

1) Stable structure: The main structure is light steel structure and sandwich panel. They form a stable structure so it can resist 9-11 grade hurricane and 7 grade earthquake.
2) Quick Installation: Convenient to assemble and disassemble. Six skillful Chinese workers can finish installing 100m2in three days.
3) Flexible layout: The partition wall, window, ceiling, door are optional for clients.
4) Long service life: The components of house can be used repeatedly, so its designed life span can reach up to more than 25 years in normal environment.
5) Environmentally friendly: Almost dry construction which is environmental friendly.
6) Good performance: Water proof, moisture proof, heat insulation and sound insulation.



2.Advantage
1.100% folding design.
2.Glavanized steel and 100% fire proof and water proof.
3.4 workers can install 1 set in only 4 minutes.
4.One 40 feet shipping container can load 12 sets.
5.It can save transportation, installation&storage cost.
6.We have sold a lot to Qatar, Oman, USA, Japan, Australia and South America.
7.This folding container house design, we have patent in China. Our factory is the biggest manufactured area in China.
8. It can used for container dormitory, container office and container apartment design.
3.Details


4.Installation
Only 3min!!!


Foldable container house is a green product with standardized design and production.
It is widely used in housing, workers’ dormitory, shops, etc. It is easy to assemble and disassemble, just lift the roof with a crane and tighten the screws. In 10 minutes, two people can cooperate to assemble a house. Its advantages and characteristics are easy to assemble and install. Easy to pack and save transportation costs.
Application: house/office/hotel/dormitory/cafe/sale booth/labor camp/restaurant etc.
5.Packaging
20GP:10 Sets Container House
40HQ:20 Sets Container House

6.Production Process

Product detail pictures:
Related Product Guide:
Our commission would be to serve our customers and clientele with very best excellent and aggressive portable digital products for Professional Design House Container Luxurious - New Style Prefab Folding Furnished Container House Tiny House – Vanhe , The product will supply to all over the world, such as: Uruguay, Mauritania, United Arab emirates, We hope we can establish long-term cooperation with all of the customers. And hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!
How to Buy a VHCON Prefab House?
Step 1: Initial Enquiry or Display Hall Visit
Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.
You can also book a private tour at our Display Hall to view our houses in person.
Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.
Step 2: Site Suitability & Pre-Approval Check
Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.
You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.
This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.
Step 3: Contract Signing & Initial Deposit
Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.
This contract will outline:
- The scope of works and what’s included in your Expander Home package
- Customisations (if any) and your selected finishes
- Estimated timeframes for manufacturing, delivery, and installation
- Payment terms, including deposit and progress payments
To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.
Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.
Step 4: Factory Construction
Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.
The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.
Step 5: Shipping, Transport & Delivery
Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.
Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.
After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.
This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.












