Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe

Short Description:


Product Detail

Related Video

Feedback (2)

We've got a specialist, effectiveness staff to supply high quality service for our shopper. We always follow the tenet of customer-oriented, details-focused for Metal Building Kit, Ready Made Home, container house prefab, We welcome all of the purchasers and pals to contact us for mutual added benefits. Hope to do additional business enterprise along with you.
Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe Detail:

1.Building System

Higher reliability of steel work. Long using time up to 50 years.

●Steel structure is impact, stable and good anti-seismic of the weight is light.        

●Steel structure used for a higher degree of industrialization.

●Steel structures can be assembled quickly and accurately, time saving and labor saving.

●Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 80meters.       

●Likely to cause sealing structure.

●Beautiful appearance: can use different colors and structure.  

●Environment friendly: Most of the excess material can be 100% recycled.

●Lower cost and easy maintenance.

●Flexible:   can be dismantled and enlarged.   

●Manufacture under complete quality control system—ISO9001/ISO14000.

1
.Building  (1)
2

2.Overseas Project

(Over than 2000+projects)

.Building  (2)

3.Steel Structure Customer Feedback

.Building  (3)

4.Quote Information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.Project site location:

2.Overall dimension (length*width*eave height in meters):

3.Mezzanine or not? How many kgs of load per square meter on mezzanine?

4.Single-layer steel sheet wall or sandwich panel wall:

5.Snow load if applicable:

6.Wind speed/load:

7.Interior column allowed or not:

8.Overhead crane needed or not,capacity?:

9.Any other particular requirements?:

Building Purpose:we will recommend the best design for the purpose of the building

A.Warehouse/Storage

B.Factory

C.Agriculture Barn

D.Retail Store

E.RepairlMechanic Shop

F.Office Space

G. Medical Warehouse

H.Animal Farm (please confirm what kind of animal)

 

.Building  (4)

5.Company

 .Building  (5)

6.Packaging&Delivery

 

.Building  (6)


Product detail pictures:

Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures


Related Product Guide:

Our company sticks into the basic principle of "Quality is definitely the life of the business, and status may be the soul of it" for Short Lead Time for Building Metal - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe , The product will supply to all over the world, such as: United Kingdom, Qatar, El Salvador, We pay high attention to customer service, and cherish every customer. We have maintained a strong reputation in the industry for many years. We are honest and work on building a long-term relationship with our customers.
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Gary from Berlin - 2018.07.26 16:51
    The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Joseph from Philippines - 2017.12.02 14:11
    Write your message here and send it to us