China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe

Short Description:


Product Detail

PROCESS

Related Video

Feedback (2)

We are also focusing on improving the stuff management and QC system so that we could keep great advantage in the fiercely-competitive business for Metal Carports, Container House Price, container home, Should you be interested in almost any goods, remember to truly feel totally free to get in touch with us for further facts or be sure to deliver us email right, we will reply you in just 24 hrs as well as the finest quotation are going to be provided.
China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe Detail:

1.Building System

Higher reliability of steel work. Long using time up to 50 years.

●Steel structure is impact, stable and good anti-seismic of the weight is light.        

●Steel structure used for a higher degree of industrialization.

●Steel structures can be assembled quickly and accurately, time saving and labor saving.

●Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 80meters.       

●Likely to cause sealing structure.

●Beautiful appearance: can use different colors and structure.  

●Environment friendly: Most of the excess material can be 100% recycled.

●Lower cost and easy maintenance.

●Flexible:   can be dismantled and enlarged.   

●Manufacture under complete quality control system—ISO9001/ISO14000.

1
.Building  (1)
2

2.Overseas Project

(Over than 2000+projects)

.Building  (2)

3.Steel Structure Customer Feedback

.Building  (3)

4.Quote Information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.Project site location:

2.Overall dimension (length*width*eave height in meters):

3.Mezzanine or not? How many kgs of load per square meter on mezzanine?

4.Single-layer steel sheet wall or sandwich panel wall:

5.Snow load if applicable:

6.Wind speed/load:

7.Interior column allowed or not:

8.Overhead crane needed or not,capacity?:

9.Any other particular requirements?:

Building Purpose:we will recommend the best design for the purpose of the building

A.Warehouse/Storage

B.Factory

C.Agriculture Barn

D.Retail Store

E.RepairlMechanic Shop

F.Office Space

G. Medical Warehouse

H.Animal Farm (please confirm what kind of animal)

 

.Building  (4)

5.Company

 .Building  (5)

6.Packaging&Delivery

 

.Building  (6)


Product detail pictures:

China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures

China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe detail pictures


Related Product Guide:

Using a total scientific good quality management process, superior high quality and excellent faith, we get great name and occupied this field for China Supplier Modular Construction - Gable frame light metal building prefabricated industrial steel structure warehouse – Vanhe , The product will supply to all over the world, such as: Greek, Czech, Latvia, The best and original quality for spare parts is a most important factor for transportation. We may stick on supplying original and good quality parts even a little profit earned. God will bless us to do kindness business forever.

How to Buy a VHCON Prefab House?

Step 1: Initial Enquiry or Display Hall Visit

Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.

You can also book a private tour at our Display Hall to view our houses in person.

Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.

Step 2: Site Suitability & Pre-Approval Check

Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.

You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.

This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.

Step 3: Contract Signing & Initial Deposit

Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.

This contract will outline:

  • The scope of works and what’s included in your Expander Home package
  • Customisations (if any) and your selected finishes
  • Estimated timeframes for manufacturing, delivery, and installation
  • Payment terms, including deposit and progress payments

To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.

Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.

Step 4: Factory Construction

Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.

The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.

Step 5: Shipping, Transport & Delivery

Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.

Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.

After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.

  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Giselle from Slovenia - 2018.09.29 17:23
    We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Victor Yanushkevich from Oman - 2017.03.07 13:42
    Write your message here and send it to us