Pure Mod | Premium 2-Day Modular Prefab Home | Light-Gauge Steel

Short Description:

Redefine efficiency with Pure Mod, the ultimate light-gauge steel modular home designed for those who value speed without sacrificing luxury. Engineered for precision and rapid deployment, the Pure Mod transforms the building process into a seamless assembly experience.

Key Features:
Ultra-Fast Deployment: Our advanced 16-module system allows a 4-person crew to fully install your home in just 48 hours. Save significantly on labor costs and construction time.
Turnkey Perfection: Forget the hassle of interior finishing. Every unit arrives with integrated, pre-finished wall panels and a fully modular bathroom, meaning your home is move-in ready the moment installation is complete.
Robust Engineering: Built on a premium light-gauge steel structural system (4000L x 5700W x 2750H mm), Pure Mod combines industrial strength with modern architectural aesthetics.
Whether you are looking for a vacation retreat, an ADU, or a rapid housing solution, Pure Mod delivers a high-quality, plug-and-play lifestyle.


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Qutside size: L4000*W5700*H2750mm Clear Height:H2.36mm
  • Weight: 5T
  • Span life: 50 years
  • Structural system: Light Steel System
  • Product Detail

    PROCESS










  • Previous:
  • Next:

  • How to Buy a VHCON Prefab House?

    Step 1: Initial Enquiry or Display Hall Visit

    Start by contacting the VHCON sales team for a no-obligation chat about your project. We’ll walk you through the options, answer any questions, and explain what’s involved with owning a VHCON Modular House.

    You can also book a private tour at our Display Hall to view our houses in person.

    Whether you’re still planning or ready to move ahead, this first step is all about giving you clarity, confidence, and expert advice from the start.

    Step 2: Site Suitability & Pre-Approval Check

    Once you’re ready to proceed, we’ll connect you with our trusted Building Certifier and Structural Engineer for a preliminary assessment. Alternatively you can provide your own preliminary assessment from a town planner or building certifier to assess eligibility.

    You will need to provide your own site plan to conduct a preliminary assessment. This preliminary assessment helps identify any potential planning restrictions, zoning issues, or site challenges early on — such as setbacks, overlays, wind speed, and climate zone.

    This step ensures you have confidence that your project is likely to meet council and building code requirements before moving further into the approvals process.

    Step 3: Contract Signing & Initial Deposit

    Once your site has been deemed suitable and you’re ready to move forward, we’ll prepare your Build Contract.

    This contract will outline:

    • The scope of works and what’s included in your Expander Home package
    • Customisations (if any) and your selected finishes
    • Estimated timeframes for manufacturing, delivery, and installation
    • Payment terms, including deposit and progress payments

    To secure your place in our production schedule, a non-refundable initial deposit is required upon signing. This deposit confirms your commitment and allows us to begin the next steps — including final plans, engineering, and scheduling your batch build.

    Note: We’ll ensure you have ample time to review and understand all contract details, and we’re here to answer any questions before you sign.

    Step 4: Factory Construction

    Once your contract is finalised, your home enters our scheduled production process. Built in controlled factory conditions by our trusted manufacturing partners, this approach ensures consistent quality, weather protection, and reliable delivery timelines.

    The Express Portables design team oversees all aspects of compliance, workmanship, and detail throughout the build. Construction typically takes 9–11 weeks to complete.

    Step 5: Shipping, Transport & Delivery

    Once factory construction is complete, your home is carefully prepared for shipment. International shipping from our manufacturing facility typically takes 4–5 weeks.

    Transport to your site is scheduled in coordination with you or your site builder. Your builder is responsible for unloading the building onto the prepared footings and beginning the installation process.

    After installation, the customer is required to arrange the final Occupancy Certificate, with guidance and support provided by our Building Certifier to ensure a smooth approval process.

  • Write your message here and send it to us